Process Guide

SAP SD Sales Contracts — Quantity, Value & Release Orders

CQ · WK1 & WK2 · release orders · VA41 / VA42 / VA43 · Last updated November 2026

One sentence from SAP’s documentation explains almost everything about contracts: a contract holds quantity and price information, but no schedule of delivery dates. That absence is the whole design. It is why release orders exist, why scheduling agreements are a separate thing, and why a contract on its own never delivers anything.

This guide covers the contract family, what the system checks when someone releases against one, what “released” actually counts, and the asymmetry nobody expects: a quantity contract and a value contract do not complete the same way. For SAP S/4HANA on-premise, release 2025 FPS02.

01

The contract family

Five documents, and the useful split is not quantity versus value — it is what you release against. Four of these are released against; the fifth is an umbrella.

Quantity contract

CQ

An agreement that the customer will order a certain quantity of a product during a specified period. It holds basic quantity and price information but no schedule of delivery dates and quantities.

Value contract, general

WK1

An agreement up to a target value rather than a quantity, covering a group of materials. You specify a product hierarchy or an assortment module, and everything in it becomes releasable. SAP proposes this type whenever the contract covers several materials.

Value contract, material-related

WK2

A value contract for one material, usually a configurable one. SAP’s own example is a software company agreeing a $500,000 contract with a customer for one specific software product.

Service contract

WV

A long-standing standard type for service and maintenance agreements, which can also be grouped beneath a master contract.

Master contract

—

Not a contract you release against. It is a header-only document that groups other contracts beneath it as lower level contracts, so the general terms stay consistent across all of them.

WK1 and WK2 are the two value contract types defined in the standard system as documented for S/4HANA 2025. CQ, WV and DS are long-standing standard types in SAP’s sales document type documentation; confirm the exact codes in VOV8 on your own system, since standard type keys vary between releases and client configurations.

All of them are sales documents, so they are configured through the same sales document type machinery as an order, and created with VA41, changed with VA42 and displayed with VA43.

02

Release orders and the three checks

The customer fulfils a contract by placing sales orders against it. These are release orders, or call-offs. Because the contract contains no schedule lines with delivery dates, the released goods have to be issued through an order — and when you create one with reference to the contract, the system updates the released quantity or value automatically.

Scroll the diagram sideways to see all of it →

How a release order consumes a sales contractA contract holds a target quantity or value, a validity period and release rules. The customer fulfils it by creating a release order, which is a sales order created with reference to the contract. The system then updates the released quantity or value in the contract automatically. At creation the system runs three checks: whether the released materials conform to the rules of the contract, whether the release order is within the contract’s validity period, and whether the release exceeds the remaining open quantity or value.A contract has no schedule lines — which is why release orders existCONTRACTA target quantity or value,a validity period, release rulesRELEASE ORDERA sales order createdwith reference to the contractCONTRACT UPDATEDThe released quantity or valuegoes up automaticallyAt creation the system checks all three of these1Do the released materials conform to the rules of the contract?2Is the release order within the contract’s validity period?3Does the release exceed the remaining open quantity or value?Most refused release orders fail the first two. Open value is only the third.

The release order cycle and the three checks SAP runs at creation.

Those three checks are the practical heart of the topic. Most people know the third one — is there enough left? — and are surprised by the first two. For a value contract you can only release materials belonging to the sales area of the contract, and only materials that are valid at the time of the release can be copied in.

A setting worth knowing: if a customer has a contract and someone creates a sales order without referring to it, the system can propose the contract automatically. The control is the Outline Agrmt Mess. field in the Define Sales Document Type activity. Businesses that complain their contracts are never consumed usually have this switched off and a sales team that forgets to reference anything.

Beyond the reference, a release order behaves like any other order. SAP says so directly: processing a release order is just like processing a standard sales order. Its link back to the contract is ordinary copy control, which is the first place to look when a release will not create at all. For value contracts specifically, Customizing lets you set a release order type, and in the standard system that type is WA.

03

What "released" actually counts

This is where finance and sales fall out, because the released value is broader than the invoiced value and nobody says so out loud.

The release order value

Calculated from the total of the open order values, plus the open delivery values, plus the value that has already been billed to the value contract. An open order consumes contract value immediately — long before anyone invoices it.

It is not a one-off calculation either. The system also updates the released value for subsequent changes: overdelivery of a contract release, price changes in the billing document, partial deliveries, returns, rejection of order items, and cancellation or reversal of orders, deliveries or billing documents. A returned delivery gives value back to the contract.

Currency

Release in any currency

A release order can be created in any currency. The system converts it into the currency agreed in the value contract, using the pricing date of the release order — so the rate that applies is the order’s, not the contract’s.

Billing

Two ways to bill a value contract

Either per release order, which is the familiar path, or the value contract directly. Billing the contract directly requires a billing plan on it — worth establishing early, because it changes what the customer receives and when.

Value contracts can also carry their own price agreements, usable at any level — prices for individual materials, or discounts valid for every released material. Those sit inside the same pricing machinery as everything else. Contract duration can also be agreed at item level and differ from the header.

Free download

Get the free SAP SD Interview Starter Kit

A free sample of The SD Vault, sent to your inbox. No payment, no account.

  • ✓25 most-asked interview questions, with full answers
  • ✓1 complete configuration scenario, IMG paths and T-codes
  • ✓A 7-day prep plan you can actually follow

One email with your kit. Occasional SAP SD tips after that — unsubscribe any time.

04

Master contracts

A master contract is not something you release against. It is a document under which you group other contracts as lower level contracts, holding the general terms that apply to all of them over a specified period. Quantity, value and service contracts can all sit beneath one.

What it holds

Header data only

Business data, partner data, contract data and billing plan data. No items. Its overview screen lists every lower level contract referring to it, and you can branch straight into them.

What links them

The referencing procedure

Assigned to the master contract type in Customizing, it determines which data is copied from the master into the lower level contracts. If an agreed term is not reaching them, this is the object to inspect — not the contracts themselves.

The purpose is consistency: the terms in the master are granted in all the lower level contracts, and the data across them stays aligned. It is the right answer whenever a customer negotiates once at group level and then transacts separately per division or region.

05

When is a contract complete?

Two different answers, and the difference is worth memorising because it explains a whole category of “why is this still open?” tickets.

Quantity contract

Closes itself through fulfilment

Complete when there are no more items to be delivered. Deliver everything and the contract completes on its own.

Value contract

Needs a deliberate act

Complete when you enter a reason for rejection. Reaching the target value is not, by itself, what closes it.

In either case, if items are still outstanding and the business wants the contract closed anyway, assign a reason for rejection to those items and the system sets the contract status to complete. The procedure for rejecting items in a contract is identical to rejecting items in a sales order, so there is nothing new to learn — only the knowledge that it is the mechanism.

06

Contracts vs scheduling agreements

The cleanest distinction in SD, and it comes directly from SAP: a quantity contract holds quantity and price but no schedule of specific delivery dates and quantities — and if the customer provides delivery information, you create a sales scheduling agreement instead.

ContractScheduling agreement
Delivery datesNone — no schedule linesCarries its own schedule lines
How goods are issuedThrough a separate release orderDelivered directly against the schedule
Customer providesA commitment to a quantity or valueActual delivery information
Typical useAn agreed volume or spend over a periodOngoing supply against a rolling schedule

Scheduling agreements have their own depth — forecast delivery schedules, JIT delivery schedules and planning delivery schedules, with standard types such as LZJ and LZJQ for JIT and JIS processing. One distinction is worth carrying even if you never configure them: forecast and JIT delivery schedules are both relevant for requirements planning, but only JIT delivery schedules are relevant for delivery. That single rule explains most “the forecast is in the system but nothing shipped” conversations.

07

Troubleshooting

01

A release order is refused although the contract has plenty of open value left

  • ·The material is not in the contract’s assortment module or product hierarchy
  • ·The material is outside the sales area of the value contract
  • ·The release order date falls outside the contract’s validity period
  • ·The partner raising the release is not authorized to release against the contract

Fix: Open value is only one of three things SAP checks. It also checks that the released materials conform to the rules of the contract and that the release order is inside the validity period. For a value contract you can only release materials belonging to its sales area, and only materials valid at the time of the release can be copied. Work through the three checks in that order rather than staring at the remaining value.

02

Users keep creating ordinary sales orders and ignoring the contract

  • ·Nothing prompts them, so the contract quietly never gets consumed

Fix: This is configurable and rarely switched on. If a customer has a contract and someone creates a sales order without referencing it, the system can propose the contract automatically — the setting is the Outline Agrmt Mess. field in the Define Sales Document Type activity. It turns a reporting problem into a prompt at the moment it matters.

03

The released value does not match what was invoiced

  • ·The released value is broader than the billed value

Fix: Not a defect. The release order value is calculated from the total of the open order and delivery values plus the value already billed to the contract, so open orders count against the contract before anything is invoiced. SAP also updates the released value for later events — overdelivery, price changes in the billing document, partial deliveries, returns, rejected items, and cancellations or reversals.

04

A contract still shows as open although the business considers it finished

  • ·A quantity contract still has items to be delivered
  • ·A value contract has no reason for rejection on its outstanding items

Fix: The two complete differently. A quantity contract is complete when there are no more items to be delivered; a value contract is complete when you enter a reason for rejection. If items are still outstanding and the business wants the contract closed anyway, assign a reason for rejection to them — the same procedure as rejecting items in a sales order — and the system sets the status to complete.

05

Terms agreed at group level are not reaching the individual contracts

  • ·The referencing procedure on the master contract type does not copy that data

Fix: The link between a master contract and its lower level contracts is controlled by the referencing procedure assigned to the master contract type in Customizing, and that procedure determines which data is copied down. If a term is not arriving, the referencing procedure is where to look, not the individual contracts.

08

Five interview questions

Q01

What is the difference between a contract and a scheduling agreement?

Delivery dates. SAP puts it plainly: a quantity contract holds basic quantity and price information but no schedule of specific delivery dates and quantities, and if the customer provides delivery information you create a sales scheduling agreement instead. That is also why a contract needs release orders at all — it has no schedule lines, so something has to carry the delivery. A scheduling agreement already carries its own schedule lines and delivers directly against them.

Q02

What does the system check when a release order is created?

Three things: that the released materials conform to the rules of the contract, that the release order is within the contract’s validity period, and whether the released value or quantity exceeds the remaining open value or quantity. Candidates usually name only the third. Naming the first two is what separates someone who has debugged a refused release order from someone who has read about contracts.

Q03

What is the difference between WK1 and WK2?

Scope. WK1 is the general value contract, where you specify a product hierarchy or an assortment module and everything in it becomes releasable — SAP proposes this type whenever the contract covers several materials or a group of them. WK2 is material-related: a value contract for one material, usually configurable. Both are agreements up to a target value rather than a target quantity.

Q04

A customer wants one umbrella agreement with separate contracts underneath. How would you model that?

A master contract with the individual contracts grouped beneath it as lower level contracts. The master holds header data only — business data, partner data, contract data and billing plan data — and quantity, value and service contracts can all be grouped beneath it. What actually flows down is controlled by the referencing procedure assigned to the master contract type, so I would design that procedure around whichever terms the customer wants held constant.

Q05

When is a sales contract complete?

It depends which kind, and the asymmetry catches people out. A quantity contract is complete when there are no more items to be delivered — it closes itself through fulfilment. A value contract is complete when you enter a reason for rejection, so it needs a deliberate act. In both cases, if items are still outstanding and you want the contract closed, assigning a reason for rejection to those items sets the status to complete.

More of these, graded by depth, in the SAP SD interview questions collection, or try the free sample.

Where this sits in the SD landscape

A contract is a sales document like any other, configured through VOV8 and linked to its release orders by copy control. Who may release against it is a partner determination question, and once a release order exists it rejoins the ordinary Order-to-Cash process with nothing unusual about it.

Frequently Asked Questions

What is a sales contract in SAP SD?

An outline agreement with a customer covering a quantity or a value over a specified period. It carries quantity and price information but no schedule of delivery dates, so the customer fulfils it by placing sales orders against it — known as release orders or call-offs. Contracts are created in VA41, changed in VA42 and displayed in VA43.

What is the difference between a quantity contract and a value contract?

A quantity contract commits the customer to order a certain quantity of a product during a period. A value contract is an agreement for materials and services up to a specified target value, and can cover a group of materials through a product hierarchy or an assortment module rather than a single quantity of one product.

What is a release order in SAP SD?

A sales order created with reference to a contract, also called a call-off. Because the contract contains no schedule lines with delivery dates, the goods are issued through this order. When you create one, the system automatically updates the released quantity or value in the contract, and otherwise processing it is just like processing a standard sales order.

Which release order type is used for value contracts?

In Customizing for value contracts you can set a release order type for the release contract, and in the standard SAP system that type is WA. A quantity contract does not need a special type — its release order is processed like an ordinary sales order.

How is the released value in a value contract calculated?

From the total of the open order and delivery values plus the value that has already been billed to the value contract. The system also updates it for later changes such as overdelivery, price changes in the billing document, partial deliveries, returns, rejection of order items, and cancellation or reversal of orders, deliveries or billing documents.

Can a release order be in a different currency from the contract?

Yes. You can create a release order in any currency, and the system automatically converts it into the currency agreed in the value contract, using the pricing date of the contract release order.

Who is allowed to release against a contract?

The sold-to party, plus any other partners you authorise. In a value contract you specify the additional partners who may release by assigning them the partner function AA, and you can define additional ship-to parties for release orders using the same partner function.

What is a master contract used for?

Grouping contracts as lower level contracts so that the general terms apply to all of them and the data stays consistent. Quantity, value and service contracts can all be grouped beneath one. A master contract holds header data only, and which data is copied down into the lower level contracts is controlled by the referencing procedure assigned to the master contract type.

Rahul Narain Saxena, SAP SD Solution Architect

Written by

Rahul Narain Saxena

SAP SD Solution Architect with 17+ years of hands-on implementation experience across SAP ECC and S/4HANA. Every guide on The SD Vault is written from live project experience, not summarised from documentation.

“The contract has open value. Why was the release order refused?”

Three checks, and most candidates name one. The SD Vault has 230+ depth-graded questions and 38 configuration scenarios built to be answered the way an interviewer actually wants.

Get Lifetime Access →

Practise more SAP SD configuration scenarios inside SD Vault.